Waterproofing contractor in Dubai · Trade Licence No. 1272765Free site inspection and written quote · 056 129 1642
AR Project Management Logo

Also offered

One team for the work around waterproofing

Maintenance, painting, screed and self-leveling, epoxy floors and fit-out, planned together with your waterproofing so every layer is done once and in the right order.

  • Trade Licence No. 1272765
  • Free site inspection and written quote
  • One project team

Why does the order matter?

A floor is built in layers, and each layer depends on the one below it. One team can take a job through them in order.

  1. 1

    Waterproofing

    Seals the slab and the surface against water.

  2. 2

    Screed and self-leveling

    Gives a level, strong base.

  3. 3

    Floor finish

    Epoxy, tiles, vinyl or carpet on that base.

  4. 4

    Painting and finishing

    Walls and ceilings finished after the work.

Which flooring and coating jobs have we done?

Three of our larger epoxy and screed jobs. The full list of named projects is on our projects page.

  • 2,600 m²

    Konica Laboratory

    Epoxy floor coating, for Al Orobo Contracting.

  • 2,148 m²

    HVAC shed area

    Screed and floor coating, for Gopinath Technical Company.

  • 1,800 m²

    Aswaaq Cold Room

    Epoxy floor coating.

WhatsApp us