Waterproofing contractor in Dubai · Trade Licence No. 1272765Free site inspection and written quote · 056 129 1642
AR Project Management Logo

Epoxy floor coating for warehouses and industrial floors in Dubai

An epoxy floor is only as good as the concrete under it. We grind, repair and prime the slab first, then apply a seamless coating that is easy to clean and stands up to heavy traffic.

  • Trade Licence No. 1272765
  • Free site inspection
  • Written quote

Epoxy floor coating

How does AR Project Management apply epoxy floor coating?

We inspect the floor for free, then prepare the concrete, repair cracks and joints, and prime it before the epoxy goes on. The result is a seamless floor that resists oil, chemicals and heavy traffic, with anti-slip and food-grade options. Our jobs include a laboratory floor of about 2,600 m² and a cold room of about 1,800 m².

When do you need an epoxy floor?

  • A bare concrete floor that dusts or wears away
  • A coating that peels, blisters or lifts
  • Oil, chemical or wash-down damage to the floor
  • A floor that is hard to clean, or slippery when wet
  • Cracked or crumbling joints

Why do epoxy floors fail?

Epoxy grips concrete mechanically, so the slab needs a rough, clean, sound surface. Weak, powdery laitance, old sealers, oil, dust left after grinding, and a surface that is too smooth all stop the coating from bonding. Most failures that are blamed on the product start at the join between the resin and the concrete.

Moisture is the other common cause. Water vapour moving up through the slab collects under the coating and shows up as blisters, whitening and peeling. It is measured before coating, with tests such as ASTM F1869 for moisture vapour emission and ASTM F2170 for relative humidity in the slab, and it is dealt with by a moisture-tolerant system or a vapour-barrier primer. New concrete also needs time to cure before it is coated.

Where does an epoxy floor fail first?

Cracks and joints

Cracks, joints and spalls that are not repaired let the coating lift under load.

Damp or new concrete

Moisture rising through the slab pushes the coating off the surface.

Poor preparation

Dust, oil and a smooth surface stop the resin bonding to the concrete.

Heavy traffic zones

Wheeled traffic and impact wear a coating that was not chosen for the load.

How do we apply an epoxy floor?

We start with the slab. We grind the concrete and extract the dust, repair cracks and joints, and prime the surface so the coating bonds.

Then the epoxy goes on as a seamless layer, with the finish chosen for the use: anti-slip for wet areas, food-grade for food areas and cold rooms, and an easy-to-clean surface for warehouses and laboratories. Epoxy is a hard, chemical-resistant surface. Where a floor sees thermal movement or impact, the system has to be chosen for that, and we advise after the inspection.

  • Epoxy floor coating
  • Anti-slip finish
  • Food-grade finish
  • Screed or self-leveling base
  1. 1

    Inspection

    We check the slab, its cracks and joints, the traffic it carries and what is spilled on it.

  2. 2

    Preparation

    We grind the concrete, extract the dust, repair the cracks and prime the surface.

  3. 3

    Application

    We apply the epoxy as a seamless layer, with the finish chosen for the use.

  4. 4

    Handover

    We check the finished floor with you.

The scope, system, testing, timeline, exclusions and warranty terms are all written in your quote. Nothing starts until you approve it. See our Service Terms.

Which jobs have we done?

Al Orobo Contracting, Konica Laboratory

Epoxy flooring, 2,600 m².

Aswaaq Cold Room

Epoxy flooring, 1,800 m².

Al Faisaliya Contracting

Epoxy flooring, 2,000 m².

Dubai Euro Contracting Co. LLC

Epoxy flooring and protective coatings, including substations, 2,300 m².

GEMACO Interiors LLC

Epoxy flooring.

Hayat Regency

Epoxy flooring.

Space Decor LLC

Epoxy flooring.

What do clients say?

AR Project Management completed epoxy floor coating works for the Konica Laboratory project. The scope involved a large flooring area and a specified coating system. We appreciated the team's contribution to the project.

Al Orobo ContractingKonica Laboratory

We appointed AR Project Management for epoxy floor coating works in our cold room facility. The project involved a sizeable floor area, and we appreciated the team's work on the coating application.

Aswaaq Cold Room

AR Project Management carried out epoxy coating works for our project. We appreciated the team's involvement in completing the specified flooring protection works.

Al Faisaliya Contracting

Questions about epoxy floor coating

Can an epoxy floor be anti-slip and food-grade?

Yes. Smooth epoxy can be slippery when wet, so wet areas get an anti-slip texture, and food areas such as cold rooms use a food-grade system. At Aswaaq Cold Room we coated about 1,800 m².

Why does an epoxy floor peel or blister?

Most often because of surface preparation or moisture. A smooth or dusty slab, or water vapour rising through the concrete, stops the coating bonding. A repair means removing the failed coating, preparing the slab again and recoating.

How long must new concrete cure before it is coated?

It depends on the slab and the product, but coating too early traps moisture and weakens the bond. The slab is tested for moisture before the coating goes on, and we do not coat until it is ready.

WhatsApp us