Waterproofing contractor in Dubai · Trade Licence No. 1272765Free site inspection and written quote · 056 129 1642
AR Project Management Logo

Bathroom and wet area waterproofing in Dubai

A bathroom leak shows up as a damp wall base or a stain on the ceiling below. We waterproof the floor and the lower walls before the tiles go on, and test the work with water first.

  • Trade Licence No. 1272765
  • Free site inspection
  • Written quote

Bathroom and wet area waterproofing

How does AR Project Management waterproof a bathroom?

We inspect for free, then waterproof the floor and the base of the walls with a cementitious or PU system before any tile is fixed. The system is water-tested before the tiles go back. We also waterproof pantry, kitchen and other wet areas in offices, shops and hotels.

What are the signs?

  • Damp that creeps up the base of a wall
  • A stain on the ceiling of the room below
  • Peeling paint or lifting tiles near the shower or floor
  • White salt deposits on the wall
  • A musty smell or mould in a wet area

Why do bathrooms leak?

A bathroom is a small room with a lot of water. Tiles and grout let water through their joints, so the waterproof layer beneath them has to be complete: the floor, the corners, the base of the walls, and every opening for a drain or a pipe.

Failures usually sit at junctions, not on the open floor: where the floor meets the wall, around the floor drain, and around pipes and shower fittings. A membrane that is thin in a corner, or applied over a dusty surface, can leak even when the product is good.

Where does a bathroom fail first?

Floor and wall corners

The membrane has to run continuously around every internal corner.

Floor drains

The seal between the drain and the membrane is a common weak point.

Pipes and shower fittings

Every opening through the wall or floor must be sealed by hand.

The base of the walls

Water climbs the lower wall, so the membrane has to continue up it.

How do we fix it?

Cementitious waterproofing is a rigid, cement-based coating that suits stable wet areas. PU is a flexible liquid that bridges small movement and copes well with corners, drains and pipes. We choose between them for the room, and for what sits above and below it.

Whatever the system, two things decide whether it works: the detail at every junction, and a water test before tiling. Published product guidance for flood testing a membrane asks for at least 24 hours, and some guides recommend 48. The testing for your bathroom is stated in the written quote.

  • Cementitious waterproofing
  • PU liquid
  1. 1

    Inspection

    We trace the leak and check the walls, the ceiling below and the floor drain.

  2. 2

    Preparation

    We clean the surface and prime it, so the membrane bonds.

  3. 3

    Application

    We apply the system across the floor and the lower walls, sealing corners, drains and pipes.

  4. 4

    Testing

    We water-test the area before the tiles go back.

The scope, system, testing, timeline, exclusions and warranty terms are all written in your quote. Nothing starts until you approve it. See our Service Terms.

Which jobs have we done?

Dubai Hills Villas, for DPI

SBS membrane for basements and pools, and cementitious waterproofing for wet areas.

Single Business Tower, Business Bay

Waterproofing of pantry wet areas.

Avenue Mall

SBS membrane on a shop floor and skirting up to 50 cm.

Circle Mall, JVC

4 mm SBS membrane on a shop floor.

What do clients say?

We appointed AR Project Management for waterproofing works at Dubai Hills Villas, including basement and swimming pool areas, as well as internal wet areas. The team handled the different waterproofing requirements using suitable systems for each application. We appreciated their work on the project.

Dubai Hills VillasDPI

We appointed AR Project Management for waterproofing works in a pantry area at Single Business Tower. The team applied a specialised coating suitable for the wet area. We appreciated their support in completing this part of the project.

Single Business TowerBusiness Bay

AR Project Management completed waterproofing works for a shop floor at Avenue Mall, including the floor and lower wall sections. We appreciated their support in carrying out the waterproofing scope for the shop.

Avenue Mall

Questions about bathroom waterproofing

How long should a bathroom be water-tested before tiling?

The product's data sheet sets the time. One manufacturer's guidance asks for at least 24 hours and no more than 72 hours of continuous testing, and some guides recommend 48 hours. We follow the product's instructions, and the written quote states the testing for your job.

Why does the stain appear on the ceiling below, not in the bathroom?

Water passes through the floor finish and the slab, then travels before it shows. The stain is where the water comes out, not always where it goes in. We trace the source first.

Can you waterproof a pantry or a kitchen as well?

Yes. We waterproofed pantry wet areas at Single Business Tower in Business Bay, and we waterproof kitchen and bathroom wet areas for hotels and restaurants.

WhatsApp us