Floor and wall corners
The membrane has to run continuously around every internal corner.
A bathroom leak shows up as a damp wall base or a stain on the ceiling below. We waterproof the floor and the lower walls before the tiles go on, and test the work with water first.
Bathroom and wet area waterproofing
We inspect for free, then waterproof the floor and the base of the walls with a cementitious or PU system before any tile is fixed. The system is water-tested before the tiles go back. We also waterproof pantry, kitchen and other wet areas in offices, shops and hotels.
A bathroom is a small room with a lot of water. Tiles and grout let water through their joints, so the waterproof layer beneath them has to be complete: the floor, the corners, the base of the walls, and every opening for a drain or a pipe.
Failures usually sit at junctions, not on the open floor: where the floor meets the wall, around the floor drain, and around pipes and shower fittings. A membrane that is thin in a corner, or applied over a dusty surface, can leak even when the product is good.
The membrane has to run continuously around every internal corner.
The seal between the drain and the membrane is a common weak point.
Every opening through the wall or floor must be sealed by hand.
Water climbs the lower wall, so the membrane has to continue up it.
Cementitious waterproofing is a rigid, cement-based coating that suits stable wet areas. PU is a flexible liquid that bridges small movement and copes well with corners, drains and pipes. We choose between them for the room, and for what sits above and below it.
Whatever the system, two things decide whether it works: the detail at every junction, and a water test before tiling. Published product guidance for flood testing a membrane asks for at least 24 hours, and some guides recommend 48. The testing for your bathroom is stated in the written quote.
We trace the leak and check the walls, the ceiling below and the floor drain.
We clean the surface and prime it, so the membrane bonds.
We apply the system across the floor and the lower walls, sealing corners, drains and pipes.
We water-test the area before the tiles go back.
The scope, system, testing, timeline, exclusions and warranty terms are all written in your quote. Nothing starts until you approve it. See our Service Terms.
SBS membrane for basements and pools, and cementitious waterproofing for wet areas.
Waterproofing of pantry wet areas.
SBS membrane on a shop floor and skirting up to 50 cm.
4 mm SBS membrane on a shop floor.
We appointed AR Project Management for waterproofing works at Dubai Hills Villas, including basement and swimming pool areas, as well as internal wet areas. The team handled the different waterproofing requirements using suitable systems for each application. We appreciated their work on the project.
We appointed AR Project Management for waterproofing works in a pantry area at Single Business Tower. The team applied a specialised coating suitable for the wet area. We appreciated their support in completing this part of the project.
AR Project Management completed waterproofing works for a shop floor at Avenue Mall, including the floor and lower wall sections. We appreciated their support in carrying out the waterproofing scope for the shop.
The product's data sheet sets the time. One manufacturer's guidance asks for at least 24 hours and no more than 72 hours of continuous testing, and some guides recommend 48 hours. We follow the product's instructions, and the written quote states the testing for your job.
Water passes through the floor finish and the slab, then travels before it shows. The stain is where the water comes out, not always where it goes in. We trace the source first.
Yes. We waterproofed pantry wet areas at Single Business Tower in Business Bay, and we waterproof kitchen and bathroom wet areas for hotels and restaurants.
Send two photos of the problem and your area on WhatsApp, and we usually reply the same day. The inspection that follows is free.