Client reviews
Reviews of AR Project Management
Clients have reviewed our waterproofing work on villa roofs, residential buildings, swimming pools, basements, tanks and metal roofs, and our industrial flooring and coating work, across Dubai.
What do clients say about our waterproofing?
Reviews of our roof, swimming pool, basement, tank, wet-area, damp-wall and metal roof waterproofing work come first. Industrial flooring and protective coating reviews follow after them.
Showing 10 of 35 reviews
We worked with AR Project Management on waterproofing refurbishment across several residential buildings at Azizi Al Furjan. The work covered swimming pools, balconies and rooftops. We appreciated the team's approach to the project and the attention given to the different areas requiring waterproofing.
AR Project Management carried out waterproofing works for swimming pools and planter boxes across our buildings in JVC. The scope involved several areas, so proper coordination was important. We were pleased with the work completed and the team's handling of the project.
We appointed AR Project Management for waterproofing works at Dubai Hills Villas, including basement and swimming pool areas, as well as internal wet areas. The team handled the different waterproofing requirements using suitable systems for each application. We appreciated their work on the project.
AR Project Management completed waterproofing works for the swimming pool, water tank and septic tank at Villa 51. We wanted these areas properly protected, and the team carried out the required membrane and protection works. We were satisfied with the completed scope.
We had rooftop waterproofing issues at our villa and appointed AR Project Management for the refurbishment. The team carried out the membrane application and reinstated the roof tiles after the waterproofing work. We appreciated having the roof area restored as part of the project.
AR Project Management handled the rooftop waterproofing refurbishment at our property in Jumeirah Golf Estate. The work included preparing the roof, applying the waterproofing membrane and carrying out a flood test. We were happy with the completed work.
We used AR Project Management for waterproofing beneath the clay roof tiles at our villa. The team applied a liquid waterproofing system to the roof area. We appreciated their work and the attention given to this part of the property.
AR Project Management carried out rooftop waterproofing works for our villas in Umm Suqeim. The scope included membrane application and flood testing. We were pleased with the work completed and the attention given to the roof areas.
We appointed AR Project Management for waterproofing works in a pantry area at Single Business Tower. The team applied a specialised coating suitable for the wet area. We appreciated their support in completing this part of the project.
AR Project Management was involved in waterproofing refurbishment works at The Lana. The project included basement cold storage areas, planter boxes and balconies. We appreciated the team's involvement in addressing the waterproofing requirements across these different areas.
We engaged AR Project Management for roof and gutter waterproofing works at Dubai Airport Terminal 1. The work included replacing sandwich panels and treating the metal roof and gutters. We appreciated the team's contribution to this project.
AR Project Management carried out GRP lining works for the cooling water tanks at Dubai Hills Cooling Plant. The project involved several large tank areas, so the work required careful execution. We were pleased with the team's involvement in completing the tank lining works.
We appointed AR Project Management for GRP lining works inside the water tanks at the RTA Building in Bur Dubai. The team completed the protective lining works for the tanks. We appreciated their contribution to the project.
AR Project Management completed polyurethane waterproofing works on the roof of our villa in Dubai Hills. The team prepared the surface before applying the waterproofing system. We were satisfied with the completed roof waterproofing work.
We used AR Project Management for roof waterproofing at our villa in Damac Hills. The work included surface preparation, primer, liquid waterproofing application and flood testing. We appreciated the team's efforts in completing the work.
AR Project Management handled the liquid polyurethane waterproofing work on our villa roof in Meydan. A flood test was also carried out as part of the scope. We were pleased with the completed waterproofing works.
We appointed AR Project Management for epoxy flooring in the basement car park and GRP lining works for the water and septic tanks. The project involved different protective coating requirements, and we appreciated the team's work across these areas.
AR Project Management carried out repairs and waterproofing works on our metal roof and gutters in Jafza. The work included sandwich panel replacement and treatment of roof joints and gutters. We appreciated their involvement in addressing these areas.
We engaged AR Project Management for GRP lining works on the warehouse roof and gutters. The team carried out the required preparation and fibreglass lining application. We were pleased with the completed scope.
We contacted AR Project Management to address dampness on the walls at our villa. The work involved removing affected plaster, applying a crystalline waterproofing treatment and reinstating the wall finish. We appreciated the team's work in addressing the affected areas.
AR Project Management completed waterproofing works for a shop floor at Avenue Mall, including the floor and lower wall sections. We appreciated their support in carrying out the waterproofing scope for the shop.
We appointed AR Project Management for waterproofing works inside our retail unit at Circle Mall. The team applied a waterproofing membrane to the shop floor as required. We were pleased with their involvement in the fit-out works.
Industrial flooring and protective coating reviews
We worked with AR Project Management on industrial epoxy floor coating works. The team handled the flooring scope for our project, and we appreciated their support throughout the work.
AR Project Management carried out industrial floor coating works for our project. We appreciated their involvement and the completion of the flooring scope.
We appointed AR Project Management for epoxy floor coating works. The team completed the required flooring application, and we were pleased with the work carried out.
AR Project Management completed epoxy floor coating works for the Konica Laboratory project. The scope involved a large flooring area and a specified coating system. We appreciated the team's contribution to the project.
We engaged AR Project Management for screed and floor coating works in the HVAC shed area. The team carried out the flooring scope for the project, and we appreciated their support.
AR Project Management was involved in the screed and floor coating works at our D Station site. We appreciated the team's contribution to the project and the completion of the specified flooring works.
We worked with AR Project Management on industrial screed and epoxy flooring. The project required a suitable floor finish for the intended use, and we appreciated the team's involvement.
AR Project Management supported our projects with protective coatings and epoxy flooring works, including sewerage lift station and substation areas. We appreciated their involvement in handling the different coating requirements.
We appointed AR Project Management for epoxy floor coating works in our cold room facility. The project involved a sizeable floor area, and we appreciated the team's work on the coating application.
We worked with AR Project Management on industrial floor coating and waterproofing works. We appreciated their support in carrying out the required scope for our project.
AR Project Management was involved in industrial epoxy flooring and waterproofing works for our project. We appreciated their contribution and the work completed.
We engaged AR Project Management for industrial coating and waterproofing works. The project involved specialised requirements, and we appreciated their support in carrying out the assigned scope.
AR Project Management carried out epoxy coating works for our project. We appreciated the team's involvement in completing the specified flooring protection works.
