Damp walls
Moisture behind the paint pushes it off the wall.
Paint fails when the wall under it is damp, dusty or unsound. We prepare the surface, deal with the cause of any moisture, and then paint, for villas, buildings and industrial sites.
Painting works
AR Project Management paints the inside and outside of villas and buildings, and applies decorative and texture finishes, industrial and protective coatings, and anti-corrosion and fire-rated systems. We also repaint after repairs and refurbishment. Every job starts with a free site inspection and a written quote that lists the surface preparation.
Peeling and blistering start when paint loses its grip on the surface. Poor preparation is the most common cause: dust, dirt, chalk or old loose paint under the new coat. Moisture is the other. Damp walls, leaks and unsealed joints push water out through the paint, and painting a damp or hot surface can blister a fresh coat.
In a hot, humid climate timing matters as well. Paint put onto a surface heated by the sun can dry too fast, and fresh paint exposed to high humidity can blister. Where moisture is coming through the wall, repainting without stopping the source only repeats the failure.
Moisture behind the paint pushes it off the wall.
Dust, chalk and old flaking paint stop the new coat bonding.
A surface heated by the sun, or high humidity, can blister fresh paint.
Steel needs a protective system, not just a coat of paint.
Preparation comes first. We scrape or sand back to sound paint, repair cracks and patches, clean the surface and prime it. If moisture is the cause, we trace it and have it stopped before any paint goes on, and our waterproofing team can treat the wall.
Then we apply the system chosen for the surface: interior and exterior paints, decorative and texture finishes, or industrial and protective coatings, including anti-corrosion and fire-rated systems where a building or structure calls for them. The quote lists the preparation and the system.
We check the surface, any moisture and the condition of the old paint.
We repair, clean and prime the surface.
We apply the system chosen for the surface.
We check the finish with you and clean the site.
The scope, system, testing, timeline, exclusions and warranty terms are all written in your quote. Nothing starts until you approve it. See our Service Terms.
Usually because the surface was not prepared, or because moisture is still coming through the wall. Paint cannot hold on dust, chalk or damp plaster. We scrape back to sound paint, deal with the cause and prime the surface before repainting.
Yes, with planning. Paint dries too fast on a surface heated by the sun, and humidity can blister fresh paint, so we plan the day and prepare the surface for the conditions. Drying times vary by product and weather.
Protective coatings guard steel and concrete against corrosion, chemicals and wear. Fire-rated systems are used where a building's fire-safety requirements call for them. The system is chosen for the structure and listed in the quote.
Send two photos and your area on WhatsApp, and we usually reply the same day. The inspection that follows is free.