Shrinkage cracks
Too much water, a rich mix or fast drying in sun and wind.
A flat, strong base is what makes tiles, epoxy, vinyl or carpet last. We level the floor, choose between screed and a self-leveling compound, and let it dry before the finish goes on.
Screed and self-leveling
We inspect the floor for free, measure how far it is from level, and quote in writing. We use a sand-cement screed where the floor needs building up, and a self-leveling compound for a thin, smooth correction. Both give a level, strong base for tiles, epoxy, vinyl or carpet. We screeded about 2,148 m² and 1,229 m² for Gopinath Technical Company.
A screed is only as good as its mix, its curing and its bond. Too much water or a rich mix causes shrinkage cracks, silty sand weakens the surface, and a screed that dries too fast in sun or wind cracks and curls. A bonded screed fails when it lets go of the slab underneath.
Moisture sets the next limit. A floor covering can only go on once the screed has dried enough, and a thick screed takes much longer to dry than a thin layer. Measuring the moisture left in the screed is safer than counting days.
Too much water, a rich mix or fast drying in sun and wind.
Unbonded screeds lift at the edges as they dry unevenly.
A screed that does not bond to the slab comes away and sounds hollow.
A screed laid too thin, or over services without enough cover, cracks.
Screed and self-leveling compound do different jobs. A sand-cement screed is the thicker option, built up to level a floor or to cover services. A self-leveling compound is a thin, flowing layer that corrects small differences and gives a very smooth surface, usually after a primer. Thin layers dry much faster than thick ones, so the choice also decides when the next trade can start.
We choose after measuring the floor. Then we prime, lay or pour, and level with a straightedge, and we protect the floor from sun and wind while it cures. Curing and drying times depend on the product, the thickness and the weather, so we follow the product's data sheet.
We measure the floor and check what sits on it and below it.
We clean the slab and prime it, so the screed bonds.
We lay the screed or pour the compound, and level it.
We protect the floor while it cures, and tell you when it is ready for the finish.
The scope, system, testing, timeline, exclusions and warranty terms are all written in your quote. Nothing starts until you approve it. See our Service Terms.
Screed and floor coating, 2,148 m².
Screed and floor coating, 1,229 m².
Screed and epoxy flooring.
We engaged AR Project Management for screed and floor coating works in the HVAC shed area. The team carried out the flooring scope for the project, and we appreciated their support.
AR Project Management was involved in the screed and floor coating works at our D Station site. We appreciated the team's contribution to the project and the completion of the specified flooring works.
We worked with AR Project Management on industrial screed and epoxy flooring. The project required a suitable floor finish for the intended use, and we appreciated the team's involvement.
It depends on the product. One manufacturer's range is poured from about 3 mm up to about 76 mm, and thicker build-ups are made with screed instead. We follow the data sheet for the product we use.
When the screed is dry enough for that covering. Some thin compounds are ready within a day or two, thick sand-cement screeds take far longer, and the covering maker sets the moisture limit. We tell you when the floor is ready, and a moisture reading is safer than counting days.
Yes. Screed or self-leveling often forms the base for epoxy, and we have done both on the same site, for example the screed and epoxy flooring for Gopinath Technical Company.
Send two photos and your area on WhatsApp, and we usually reply the same day. The inspection that follows is free.