Waterproofing contractor in Dubai · Trade Licence No. 1272765Free site inspection and written quote · 056 129 1642
AR Project Management Logo

 Licensed in Dubai · Trade Licence No. 1272765

Looking for the best waterproofing company in Dubai? Here we are.

AR Project Management is a licensed waterproofing company in Dubai for villa and apartment owners, offices, hotels, warehouses and property managers. We inspect the roof, terrace, bathroom, basement or tank for free, trace where the water enters, and send a written quote before any work starts.

Send two photos of the problem and we usually reply the same day.

We reply instantly

Book your free site inspection

Tell us what is leaking and where. We trace the cause and send a written quote before any work starts.

Licensed in DubaiTrade Licence No. 1272765

Free site inspectionWritten quote before work starts

Tested before handoverFlood or leak test where possible

18 areas across DubaiFrom Dubai Marina to Mirdif

01Types of waterproofing

What types of waterproofing does AR use in Dubai?

The right type depends on the surface and the water problem. AR Project Management applies bituminous membranes, liquid-applied PU, the combo roof system, cementitious and crystalline treatments, injection grouting and GRP lining, and chooses between them after inspection. Each type below says what it is and where we use it.

Illustration of black bituminous membrane sheets with overlapped seams on a flat concrete roof, with a worker pressing a seam with a hand roller01

Bituminous membrane

What it is: Modified bitumen sheet, including SBS and APP, laid with overlapped, sealed joints.

Where we use it: Roofs, podiums, basements, swimming pools and shop floors.

Illustration of a worker rolling a grey polyurethane liquid coat around air-conditioning units on a villa roof terrace02

Liquid-applied membrane

What it is: A flexible polyurethane (PU) liquid built up in coats over a primed surface, with no joints.

Where we use it: Villa roofs, including under clay tiles, terraces, balconies, and metal roofs and gutters.

Illustration of a flat concrete roof built up in three zones: insulation boards, a continuous waterproofing membrane and fresh screed being levelled on top03

Combo roof system

What it is: A three-in-one roof build-up: thermal insulation, seamless waterproofing and a protective finishing screed.

Where we use it: Flat roofs on villas and buildings.

Illustration of gloved hands brushing grey cementitious waterproofing slurry into a wall and floor corner before tiling04

Cementitious waterproofing

What it is: A cement-based coat applied in layers over a prepared base.

Where we use it: Bathrooms, pantries and other wet areas, under the tiles.

Illustration of a worker brushing crystalline waterproofing slurry onto a bare concrete wall after the plaster was removed05

Crystalline waterproofing

What it is: A treatment that works into the concrete or plaster, used once the old plaster has been removed.

Where we use it: Damp interior walls, with peeling paint or white salt deposits.

Illustration of a technician connecting a hose to an injection packer in a row of ports along a crack at the base of a concrete wall06

Injection grouting

What it is: Resin injected into cracks, joints and leaking points to seal the water path.

Where we use it: Leaking joints, cracks and slabs, often with limited demolition.

Illustration of a worker rolling resin onto a fibreglass mat inside a concrete water tank being lined with GRP07

GRP lining

What it is: Layers of resin and fibreglass mat, finished with a protective coat.

Where we use it: Water tanks, pits, sumps, and metal roofs and gutters.

1 of 7

We pick the type after the free site inspection, once we have seen the surface and found where the water enters.

02What we waterproof

What does a waterproofing company in Dubai actually do?

A waterproofing company finds where water enters a building and seals that path with a membrane, a liquid system or an injected resin. AR Project Management waterproofs roofs, terraces, balconies, bathrooms, basements, water tanks, pools and metal roofs across Dubai, and traces leaks when the source is unclear.

Finished glossy white coating across a villa roof with air-conditioning units and a water tank01

Roofs on villas and buildings

The problem: Rain gets in around AC bases, water tanks and upstands, and pools where the roof does not drain.

How we seal it: SBS or APP sheet, a PU liquid coat, or our Combo system, which lays a sheet and a liquid coat together.

Learn more about roof waterproofing

Worker applying a dark cementitious coat to the base of an interior wall beside a door03

Bathrooms and wet areas

The problem: Damp creeps up the base of the wall, or a stain appears on the ceiling of the room below.

How we seal it: Cementitious or PU waterproofing, water-tested before the tiles go back.

Learn more about bathroom waterproofing

Basement slab covered in SBS membrane, with openings left for pits04

Basements and podiums

The problem: Seepage at the slab, the walls and the joints.

How we seal it: SBS membrane with a protection board, plus injection grouting where a joint leaks.

Learn more about basement waterproofing

Worker applying a crystalline coat to a damp interior wall after removing the plaster08

Damp interior walls

The problem: Peeling paint, white salt deposits, and a stain that returns after repainting.

How we seal it: We remove the old plaster, apply crystalline waterproofing, then replaster and repaint.

Learn more about wall dampness treatment

Worker injecting resin at the base of a concrete wall, with red circles marking the injection points09

Leak repair and leak tracing

The problem: Water shows up in a ceiling or wall and nobody can say where it enters.

How we seal it: We trace the source first, then seal it with injection grouting or local waterproofing.

Learn more about leak repair and tracing

We confirm the system after the free site inspection, once we have seen the surface and found where the water enters.

04Leaks and damp

Is your roof leaking again, even after a repair?

A roof that leaks again after a repair usually has an unsolved detail, not a bad membrane. Water enters at upstands, drains, pipe penetrations and joints, and it travels before it shows. AR Project Management inspects those points first, then the surface, then quotes the system that fixes the cause.

These are the common signs that water is already getting in:

  • Damp patches or peeling paint on a ceiling
  • Water stains below a roof, terrace or bathroom
  • A musty smell or mould in a basement or wet area
  • White salt deposits (efflorescence) on walls
  • Water pooling on the roof after rain
  • Leaks around pipes, drains, parapets and joints
Worker repairing a roof drain outlet with mortar on a gravel-covered roof01

Drains and outlets

Why it leaks: Water sitting at a poorly sealed outlet creeps under the membrane.

What we do: We reseal the outlet and check that water can run to it.

SBS membrane laid in a narrow parapet channel and turned up the wall02

Parapets and upstands

Why it leaks: Where the roof meets a wall, the membrane has to turn up and be sealed, and this is where leaks usually begin.

What we do: We lay the membrane up the wall and seal the edge.

Worker rolling a grey liquid coat over white fabric at a roof upstand beside AC pipework03

AC bases, pipes and joints

Why it leaks: Each one is an awkward shape that a flat sheet does not follow.

What we do: We seal them by hand with PU liquid, with careful detailing at every corner.

Damp that comes back after repainting points to the same step: find the source before choosing the product.

06How it works

How does a waterproofing job work, from booking to handover?

You start by booking a free inspection through the quote form, a phone call or WhatsApp. AR Project Management then inspects and traces where the water enters, sends a written quote before any work starts, does the work with its own team and tests it, and checks the finished job with you.

Step 1 of 5 · Start here

Book an inspection

Fill in the quote form, call us or message us on WhatsApp. Photos of the problem help us give a faster first answer.

  1. Step 2 of 5

    Inspection

    We check the roof, joints, parapets, drains and pipe penetrations, or the wet area, basement or tank. We trace where the water enters and explain what we find. The visit is free.

  2. Step 3 of 5

    Quote

    The written quote lists the scope, the system and materials, the preparation, the testing, the timeline, what is excluded and the warranty terms. Nothing starts until you approve it.

  3. Step 4 of 5

    Work

    Our own team prepares the surface, applies the primer and the system, seals the details, then tests the finished work. A flood or leak test is done where the area allows. You get updates until it is finished.

  4. Step 5 of 5

    Handover

    We check the finished work with you, clean the site and close the job.

Questions about dust, noise and timing are answered in the FAQ below.

07Cost

How much does waterproofing cost in Dubai?

We do not quote a price before we have seen the site, because the same roof size can cost very different amounts depending on its condition and the system it needs. AR Project Management inspects for free, then sends a written quote in AED that lists exactly what is included. You approve it before any work starts.

What decides the price

  • The area. The size in square metres, and how many separate surfaces.

  • The condition of the surface. Cracks, old coatings, damp, or a failed earlier repair that has to be removed first.

  • The system. SBS or APP sheet, PU liquid, cementitious, crystalline, injection grouting or GRP lining.

  • The details. Drains, parapets, pipe and AC penetrations, and joints.

  • Access and timing. Height, working space, and what has to be moved or protected.

  • Testing and finishing. A flood or leak test where the area allows, and tile or screed reinstatement.

What the written quote lists

  1. The scope of work

  2. The system and materials

  3. The surface preparation

  4. The testing

  5. The timeline

  6. What is excluded

  7. The warranty terms

Send two photos of the problem on WhatsApp and we usually reply the same day.

08Choosing a contractor

How do you choose the best waterproofing company in Dubai?

Check these ten things before you hire a waterproofing company in Dubai. Each card shows what AR Project Management does.

  1. A valid trade licence

    What AR Project Management does: AR Project Management holds Trade Licence No. 1272765.

  2. An inspection before a price

    What AR Project Management does: We inspect for free and trace where the water enters. We do not quote a price before the inspection.

  3. A written scope

    What AR Project Management does: The written quote lists the scope, the system and materials, the preparation, the testing, the timeline, what is excluded and the warranty terms.

  4. The system explained before you approve

    What AR Project Management does: We explain what we find and which system fits. Nothing starts until you approve the written quote.

  5. Testing before handover

    What AR Project Management does: A flood or leak test is done where the area allows.

  6. Who does the work

    What AR Project Management does: Our own team prepares the surface, applies the system and seals the details, then checks the finished work with you.

  7. Site safety

    What AR Project Management does: We follow HSE regulations and site safety requirements, with site supervisors and safety officers.

  8. Approved materials

    What AR Project Management does: Approved materials and certified systems.

  9. Comparable jobs

    What AR Project Management does: Villa roofs, basement and podium membranes, and GRP-lined tanks.

  10. Warranty in writing

    What AR Project Management does: Warranty terms are written in each quote.

Ask any contractor the same questions, including us.

09Who we work for

Waterproofing for villas, apartment buildings, offices, hotels, restaurants and warehouses

AR Project Management waterproofs for villa and apartment owners, offices and shops, hotels and restaurants, warehouses and property managers across Dubai. The surfaces differ: a villa terrace, a mall shop floor, a metal warehouse roof, a block of apartments. The process is the same: free inspection, written quote, testing and a handover check.

  • Villa and apartment owners

    A roof that leaks after rain, a balcony dripping into the room below, or damp and mould on a bathroom wall. We find the source first, then quote the fix.

  • Offices and shops

    Pantry and wet areas, and waterproofing under shop floors, with the timeline agreed in the written quote.

  • Hotels and restaurants

    Basement cold storage, planter boxes and balconies, and kitchen and bathroom wet areas, with the timeline agreed in the written quote.

  • Warehouses

    Metal sandwich-panel roofs and gutters that leak at the joints, and water tanks on industrial sites.

  • Property managers

    Terraces, balconies, pools and basements across several units or buildings, with the same process and handover check on each.

11Our Projects

Which waterproofing projects has AR Project Management completed in Dubai?

AR Project Management has waterproofed villa roofs, residential towers, a hotel basement, an airport terminal roof and large cooling-plant tanks across Dubai. Below are photos from our sites and four of our larger named jobs.

  • 8 residential buildings

    Azizi Al Furjan

    SBS membrane, protection board and leak testing for pools, balconies and rooftops.

  • 5 buildings

    Binghatti JVC

    10 swimming pools and planter boxes, with SBS membrane, protection layers and flood testing.

  • 2,200 m²

    Dubai Airport Terminal 1

    Metal roof and gutter liquid waterproofing, for Bhatia Brothers.

  • 3,400 m²

    Dubai Hills Estate cooling plant

    GRP lining of 3 tanks.

Black SBS membrane turned up a curved parapet wall beside outdoor steps01
SBS membrane turned up a curved parapet beside steps
SBS membrane running along a long parapet gutter and up the wall02
SBS membrane along a long parapet gutter and up the wall
A worker rolling white coating on the walls of a square manhole chamber03
White coating rolled inside a manhole chamber
A worker crouching on a flat roof coated light grey beside an AC condenser04
Light grey coating around an AC unit on a flat roof
A rooftop plant area with grey coating finished around HVAC equipment05
Finished grey coating across a rooftop plant area
A worker rolling grey coating along a terrace walkway beside AC condensers06
Grey coating rolled along a terrace beside AC condensers
A worker rolling white liquid coating over a roll of white fabric, with a bucket beside him07
White liquid coat rolled over reinforcing fabric
Two roofers working on a grey membrane beside a tiled parapet and AC units08
Roofers laying grey membrane beside a tiled parapet
A worker holding a yellow hose on a roof with a membrane upstand, beside an AC unit09
A roof membrane with its upstand beside an AC unit
A worker crouching at the base of a stone-clad wall with an injection tool, a bucket beside him10
Injection grouting at the base of a wall

1 of 10

13Get started

Send us a photo of the leak

Two photos of the problem and your area are enough for a first answer. We usually reply the same day, and the inspection is free.

14FAQ

Questions Dubai property owners ask about waterproofing

These are common questions from Dubai villa owners, building owners and property managers before they book an inspection, from cost and system choice to warranty and disruption. Each answer is short, and the written quote confirms the details for your property.

How much does waterproofing cost in Dubai?

We quote after a free site inspection, so there is no price on this website. The cost depends on the area in square metres, the condition of the surface, access and the system chosen. AR Project Management's written quote lists the scope, materials, preparation, testing, timeline and exclusions before any work starts.

Which is the best waterproofing company in Dubai, and how do I choose?

No website can prove it is the best, so check any company yourself. Ask for the trade licence, a free inspection, a written scope, testing and warranty terms in writing. AR Project Management holds Trade Licence No. 1272765 and offers each of these, and nothing starts until you approve the quote.

Is the inspection really free, and how do I get a quote?

Yes, the inspection is free. Call or WhatsApp us on 056 129 1642, or fill in the quote form, and send photos of the problem for a faster first answer. We send a written quote after the visit, and nothing starts until you approve it.

What is the best waterproofing system for a villa roof in Dubai?

It depends on the roof. PU liquid forms a joint-free layer, which suits roofs with many AC bases, pipes and upstands. SBS or APP sheet suits large, clear roofs. AR Project Management inspects first and recommends the system that fits your roof.

Why does my villa roof leak after rain, even a newer one?

Leaks usually start at drains, upstands, pipe penetrations and joints, not in the middle of the membrane. For a newer villa, read your developer's defects and warranty terms first. AR Project Management can inspect the roof for free and give you the source in writing, on 056 129 1642.

How do you find where a leak is coming from?

Water travels before it shows. We check the roof, joints, parapets, pipes and drains above the stain, and test wet areas with water. Plumbing, AC and waterproofing leaks can look alike, so the inspection comes first, and we tell you if the cause is not waterproofing.

Can you repair waterproofing that another contractor did badly?

Yes. AR Project Management inspects the failed area, finds why it failed and quotes the repair in writing. Common causes are poor surface preparation, unsealed details at drains and upstands, and ponding water. We comment on what the inspection finds, not on the previous contractor.

Do tiles make a terrace or bathroom waterproof, and can you waterproof under tiles?

No. Tiles and grout are a finish, and water passes through the joints. Waterproofing sits in the layer under the tiles. A failed layer often means lifting the tiles, though some leaks can be sealed locally, for example by injection grouting. We confirm which after a free inspection on 056 129 1642.

How long does waterproofing last, and is there a warranty?

It depends on the system, the preparation, the details and how the area is maintained, so we do not promise a fixed number of years. Warranty terms are written in each AR Project Management quote, so you can read them before approving the work.

Can you waterproof in summer or after heavy rain?

Yes. In summer we plan the day's work and prepare the surface for the heat, and curing times vary by product. Membranes and coatings need a dry surface, so after heavy rain we wait until it has dried.

How much dust, noise and disruption should I expect?

Roof and terrace work is outdoors, so most noise and dust stay outside. Bathroom and wet-area work involves stripping tiles, so expect dust and noise indoors, and the area stays out of use until it is tested and retiled. The timeline is agreed in the quote.

WhatsApp us