Pool decks and podiums
Membrane under the finish, protection layers and a flood test, with the drains and edges sealed.
Marina towers stack pool decks, podiums, balconies and bathrooms on top of one another. We trace where the water gets in, seal it, and test the work, with a free inspection first.
Dubai Marina
AR Project Management waterproofs towers in Dubai Marina: podium and pool decks, terraces and balconies, roofs, bathrooms and basements. We trace the leak, apply a membrane or liquid system suited to the surface, and test it. A free site inspection comes first, then a written quote that lists the scope, system and testing.
Dubai Marina is a waterfront district of high-rise towers around an artificial canal, with the Marina Walk below and the beachfront of JBR beside it. Emaar developed the early stages, and many developers have built towers since. A typical tower has a podium, a pool deck, balconies on every floor, a roof with plant and tanks, and parking in the basement.
In a tower, water rarely shows where it enters. A pool deck joint, a balcony threshold or a blocked drain can leak into the floor below, or into the parking levels, along a route of several metres. The sea is close, so the facades, balconies and roofs also take salt-laden air and strong sun, which age sealants and coatings. We trace the route first, and then fix the entry point.
Pool decks, podiums, roofs and facades are common areas, so the owners' association or building management normally decides who does the work. A newer tower may still be inside the developer's defects liability period, commonly 12 months after handover. Report the leak in writing and keep photos.
Membrane under the finish, protection layers and a flood test, with the drains and edges sealed.
Membrane lapped up the walls and run to the drains, under tiles or a new finish.
Membrane or liquid systems around AC bases, tanks and upstands.
Cementitious or membrane systems for wet areas, and membrane for basement slabs and walls.
Work on podiums, pool decks, roofs and facades normally needs the approval of the owners' association or building management, who may appoint the contractor. Inside your own unit, such as a balcony or bathroom, you can usually arrange the work yourself, but the building can set rules on access, noise and working hours.
A written quote from us lists the scope, system, testing, timeline and exclusions, so you can pass it to the building. Nothing starts until you approve it.
See our Service Terms for how quotes, testing and warranty are written.
The same services are available in Dubai Marina as anywhere in Dubai: nine waterproofing services, and five more for the work around them.
Yes. We apply a membrane under the finish, protect it, and flood test before the finish goes back. Call AR Project Management on 056 129 1642 for a free inspection.
Water usually gets under the tiles at the threshold, the drain or the wall junction, then follows the slab down. The repair is a membrane that laps up the walls and runs to the drain, tested before the finish goes back.
Salt-laden air and strong sun age sealants, coatings and joints faster, so the details at joints, upstands and drains matter more. We inspect them closely and say which ones need work.
Send two photos and your location on WhatsApp, and we usually reply the same day. The inspection that follows is free.