Drain outlets
A blocked or poorly sealed drain lets water pond against the layers below.
Tiles and grout are a finish, not a barrier. When water reaches the room below, the layer under the tiles has usually failed. We find where it gets through and seal it with a PU liquid membrane.
Terrace and balcony waterproofing
We inspect the terrace for free, trace where water gets through, and quote in writing. The fix is a PU liquid membrane under the tiles or finish, applied as one joint-free layer around drains, railings and edges. We test the finished area where it allows, then the finish goes back.
Tiles and grout are not meant to be waterproof. They are the finish, and the waterproof layer sits underneath. If water reaches the room below, that layer has failed or water is getting around it.
In Dubai the slab heats by day and cools by night. That repeated movement opens grout lines and the joints between tiles, which gives water a path in. Water that reaches the tile bed can also weaken the adhesive, which is why tiles lift.
A blocked or poorly sealed drain lets water pond against the layers below.
The junction between the floor and the wall is one of the most likely places for water to enter.
Each fixing passes through the finish, so each one is a point where water can get in.
Movement opens them, and water then finds the failed layer beneath.
Sealing the grout or the surface does not repair a membrane that has already failed underneath. Where the layer below has failed, the finish usually has to come up, the surface is prepared and the membrane is laid, and then the finish goes back. Where the leak is local, a smaller repair can be enough. We tell you which after the inspection.
We use a PU liquid membrane because it is applied as one continuous layer with no overlaps, around railing posts, drains and wall edges, and it stays flexible as the slab moves.
We check the drain, the tile joints, the slab edges and the railing fixings, and trace where the water enters.
We lift the finish where needed, clean the surface and prime it.
We apply the PU liquid membrane and seal the edges and fixings by hand.
A flood or leak test where the area allows, then the finish goes back.
The scope, system, testing, timeline, exclusions and warranty terms are all written in your quote. Nothing starts until you approve it. See our Service Terms.
8 residential buildings: SBS membrane, protection board and leak testing for pools, balconies and rooftops.
Basement cold storage membrane, and planter box and balcony refurbishment.
We worked with AR Project Management on waterproofing refurbishment across several residential buildings at Azizi Al Furjan. The work covered swimming pools, balconies and rooftops. We appreciated the team's approach to the project and the attention given to the different areas requiring waterproofing.
AR Project Management was involved in waterproofing refurbishment works at The Lana. The project included basement cold storage areas, planter boxes and balconies. We appreciated the team's involvement in addressing the waterproofing requirements across these different areas.
A common check is to pour water over the floor and watch for leakage below, which points to a breached membrane. A stain on the ceiling underneath after rain points the same way. It is not conclusive on its own, because stains can also come from pipes or condensation, so the inspection confirms the source.
A balcony needs a fall toward its drain. Ponding points to a surface that is too flat, a blocked drain or a sagging section, and standing water finds the weak spots in the layers below it. We check the fall and the outlet during the inspection.
Yes. Posts and fixings pass through the finish, so each one is a point where water can enter. We seal around each one by hand as part of the membrane.
Send two photos of the problem and your area on WhatsApp, and we usually reply the same day. The inspection that follows is free.