Villa roofs
Membrane refurbishment, with the upstands, joints and drains treated, a flood test and the tiles reinstated.
On a villa, the roof is the biggest surface facing the sun. We refurbish leaking roofs with a new membrane, a flood test and tile reinstatement, so the roof is finished once.
Arabian Ranches
AR Project Management waterproofs villa roofs in Arabian Ranches. At Villa 63 in Al Reem 2 we carried out a rooftop refurbishment with a new membrane, a flood test and tile reinstatement. We also treat terraces, bathrooms and pools. A free site inspection comes first, then a written quote.
Arabian Ranches is a freehold villa community developed by Emaar, built around the Arabian Ranches Golf Club and the Dubai Polo and Equestrian Club. It is villas and townhouses rather than apartment towers, in clusters such as Al Reem, Saheel, Mirador and Golf Homes.
With no tower above them, these homes have large roofs and terraces that take the full sun every day, and many have a pool as well. Rain is rare, so a weak joint, upstand or drain can sit unnoticed for years and fail in the first heavy storm. A stain on a bedroom ceiling is often a metre or more from the real entry point, so we trace the path instead of patching the stain.
Many roofs have a tile finish over the waterproofing. A proper repair means lifting the tiles over the problem, repairing the layer under them, flood testing it, and laying the tiles again.
Membrane refurbishment, with the upstands, joints and drains treated, a flood test and the tiles reinstated.
Membrane under the finish, lapped up the walls and run to the drains.
Cementitious or membrane systems on floors and lower walls.
Membrane and protection layers, tested before the finish goes on.
Rooftop refurbishment: membrane, flood test and tile reinstatement.
We had rooftop waterproofing issues at our villa and appointed AR Project Management for the refurbishment. The team carried out the membrane application and reinstated the roof tiles after the waterproofing work. We appreciated having the roof area restored as part of the project.
Villas in a developer-managed community follow community rules, and changes to the outside of a villa may need approval from the community management. Roof waterproofing may or may not count as a change, so ask before work starts.
A written quote from us lists the scope, system, testing, timeline and exclusions, so you can share it. Nothing starts until you approve it.
See our Service Terms for how quotes, testing and warranty are written.
The same services are available in Arabian Ranches as anywhere in Dubai: nine waterproofing services, and five more for the work around them.
We lift the tiles over the leak, repair or replace the waterproofing layer, flood test it, then lay the tiles again. That is the sequence we followed at Villa 63 in Al Reem 2.
Rain is rare, so a weak joint, upstand or drain can sit unnoticed until a storm tests it. The stain inside is often away from the real entry point, which is why we trace the path first.
Yes, where the roof allows. We flood test the membrane before the finish goes back, so a weak point shows before it is covered. Call AR Project Management on 056 129 1642 to book an inspection.
Send two photos and your location on WhatsApp, and we usually reply the same day. The inspection that follows is free.