Roofs and terraces
Membrane or liquid systems, with the upstands, drains and the joints around pipes and AC bases treated.
Older apartment blocks, shops and commercial buildings carry decades of wear on their roofs, bathrooms and tanks. We find where the water enters and seal it, with a free inspection first.
Bur Dubai
AR Project Management waterproofs buildings in Bur Dubai. At the RTA building we lined two water tanks, about 1,000 m² in total, with GRP, a resin and fibreglass lining that seals the surface. We also waterproof roofs, bathrooms and basements. A free site inspection comes first, then a written quote.
Bur Dubai sits on the west bank of Dubai Creek and is one of the city's oldest districts, with Al Fahidi, Al Mankhool, Karama, Oud Metha and Al Jaddaf among its neighbourhoods. It mixes apartment blocks, shops, offices and villas, and many of its buildings have stood for decades.
Roofs, terraces, bathrooms and tanks in an older building have taken years of heat, repairs and plumbing changes. Maintenance work can puncture a surface that was once sealed, and the joints around pipes and AC equipment are easy to detail badly. Water usually enters at those joints, so a repair has to deal with them, and not only with the stain it leaves inside.
Water tanks need their own care. A lining protects the tank structure from the water it holds, and a failed lining leaves the surface exposed. We inspect the tank, prepare the surface and line it with a system chosen for what the tank holds.
Membrane or liquid systems, with the upstands, drains and the joints around pipes and AC bases treated.
The failed layer removed, a cementitious or membrane system applied, and tested before the tiles go back.
Membrane for basement slabs and walls, or an internal system where the outside cannot be reached.
GRP lining for water tanks, built up in layers over a prepared surface.
GRP lining of 2 tanks, about 1,000 m².
We appointed AR Project Management for GRP lining works inside the water tanks at the RTA Building in Bur Dubai. The team completed the protective lining works for the tanks. We appreciated their contribution to the project.
In a building with several owners or tenants, the landlord, the owners' association or the building management usually approves work on the roof, the tanks and the common areas. Inside your own unit, you can usually arrange the work yourself, but check the building's rules and your tenancy first.
A written quote from us lists the scope, system, testing, timeline and exclusions, so you can pass it on. Nothing starts until you approve it.
See our Service Terms for how quotes, testing and warranty are written.
The same services are available in Bur Dubai as anywhere in Dubai: nine waterproofing services, and five more for the work around them.
Yes. At the RTA building in Bur Dubai we lined two tanks, about 1,000 m² in total, with GRP. We inspect the tank first, then quote in writing.
Maintenance work can puncture a surface that was sealed, and the joints around pipes and AC units are easy to leave weak. Water follows those joints, so the repair has to seal them and not only the stain.
Yes. We remove the failed layer, apply a cementitious or membrane system on the floor and lower walls, and test it before the tiles go back. Call AR Project Management on 056 129 1642 for a free inspection.
Send two photos and your location on WhatsApp, and we usually reply the same day. The inspection that follows is free.